SOA... Travel... Consulting... Life... Economics... IT
Resting between Blackfriars road and rail bridges...
Survey equipment. For the Thameslink, I imagine, as works proper at Blackfriars is due to start in January.
Ahh... of course. Makes sense..... They're going to put an entrance on the south side if I remember correctly.
They have to be quite careful in that area as the Waterloo & City line runs under the river by the bridge.
Post a Comment
3 comments:
Survey equipment. For the Thameslink, I imagine, as works proper at Blackfriars is due to start in January.
Ahh... of course. Makes sense..... They're going to put an entrance on the south side if I remember correctly.
They have to be quite careful in that area as the Waterloo & City line runs under the river by the bridge.
Post a Comment